Skip to content

Free download

Get Menu Engineering and Prime Cost

The full period report with made-up sample data to start from. Leave your name and work email and the download button appears right away.

  • Plain Excel. No macros, no add-ins.
  • Twelve periods on a 4-4-5 fiscal calendar, against target and last year.
  • Twenty dishes, about a hundred recipe lines and forty ingredients in the sample, with room to grow.
  • Sample data from a made-up 110-seat bistro to start from.
Free Excel templateHospitalityReporting

Free menu engineering template

Know why food cost moved, not just that it did.

Most restaurants know their food cost % every period. Few can say why it moved. This template takes the numbers you already have, from supplier prices and recipe cards to the POS product mix, the stock count, payroll and the ledger. It bridges food cost from target to actual, places every dish on a menu matrix with the top profit opportunities, tracks pour cost by beverage category and builds a management P&L from prime cost down to restaurant-level EBITDA.

Free · Excel

The top of the Summary tab in Menu Engineering and Prime Cost for the made-up Linden Street Kitchen: all 14 checks pass, five KPI tiles from total sales to prime cost, the one-line food cost answer, key numbers against target and last year, and the food cost bridge from target to actual, on sample data.

Highlights

  • Four points over target. Where did they go?

    The Summary bridges food cost from target to actual, in points and dollars. Menu pricing, purchase prices, the sales mix, comps, voids and money off the bill, waste, staff meals and the usage nobody recorded. In the sample, waste and staff meals explain 1.2 of the 4.2 points.

  • Which dishes to re-price, promote or drop

    The Menu Matrix classes every dish within its own menu section on popularity and margin. Each dish gets a class (Star, Plowhorse, Puzzle or Dog), an action and a profit opportunity, and the Summary lists the top five.

  • Fourteen checks, and blanks instead of guesses

    A missing stock count or purchase leaves food cost, prime cost and EBITDA blank instead of showing a number that looks right. The checks tie POS sales to the ledger and the bridge to the actual. They prove the file is consistent, not that the inputs are right.

Why use a menu engineering template?

A menu engineering template shows which dishes make the money and which ones only fill the ticket. Every dish is ranked on how often it sells and what it leaves after plate cost, within its own section, so a dessert is never judged against a steak.

Menu engineering alone does not explain a food cost miss. This template sets theoretical usage from the recipes against actual usage from the stock count for each stock category, and puts supplier price moves in their own line. A beef price rise shows up as purchase price variance, not as kitchen waste.

Where restaurant CFOs and controllers use it

  • Period close, after the stock count and before the P&L review with the general manager and the chef.
  • Menu changes, to see which dishes carry the margin before the menu is reprinted.
  • Supplier price rises, to separate purchase price variance from kitchen usage and test a meat or dairy increase before it hits.
  • Owner, investor and lender updates, with prime cost, EBITDA and a one-line explanation of food cost on one Summary page.

What's inside

Twelve tabs. On the input tabs only the shaded cells are inputs, everything else is a formula.

  1. About Vena and MCC

    Who built the template, and what changes when the same report runs in Vena.

  2. Use with AI

    Ten ready-made prompts for the AI assistant your company already uses, and a context block that tells the AI how the file works.

  3. Summary

    Pick the report period. Five KPI tiles, key numbers against target and last year, the food cost bridge with a waterfall chart, where the food went by stock category, the menu matrix by class, the top five opportunities and the fourteen checks.

  4. Menu Matrix

    Every dish classed within its section on popularity and plate contribution margin, with its class, an action, the profit opportunity, net contribution after card fees and packaging, and a quadrant chart.

  5. Price Scenarios

    New prices, a volume reaction, ingredient price changes by stock category and how much hourly labor flexes. It shows the change in net contribution, break-even units and prime cost. Nothing on this tab changes the actual numbers.

  6. Food Cost

    Stock counts, purchases, price changes against standard by stock category, waste, staff meals, and comps, voids and money off the bill, by period.

  7. Beverage

    Sales, stock and purchases for spirits, beer, wine and non-alcoholic drinks, with pour cost against each category's own target.

  8. P&L

    Sales by channel with delivery commissions, cost of sales, labor with productivity, prime cost, operating expenses and restaurant-level EBITDA, against target and last year.

  9. Menu

    One row per dish with its section, menu price, planned mix, plate cost and units sold by period from the POS.

  10. Recipes

    One line per ingredient per dish at the portion on the recipe card, with room for 200 lines.

  11. Ingredients

    The ingredient price list at standard cost, with pack size, recipe unit and usable yield.

  12. Settings

    The 4-4-5 calendar, cost targets, pour cost targets, menu sections, stock and beverage categories, sales channels and commissions, the popularity rule and traffic-light thresholds.

One file, the whole period report

Set up the menu, recipes and ingredients once, then enter the period's numbers. The Summary, the matrix and the P&L build themselves.

  • Menu Engineering and Prime Cost

    The period report for one full-service restaurant, from food cost to EBITDA.

    Three menu sections, five food stock categories, four beverage categories and four sales channels, all of which can be renamed on Settings. Recipes are costed at a standard price list, and price moves during the year go in by stock category, so past periods never change. EBITDA is restaurant level, before head office costs.

    Tabs

    • About Vena and MCC
    • Use with AI
    • Summary
    • Menu Matrix
    • Price Scenarios
    • Food Cost
    • Beverage
    • P&L
    • Menu
    • Recipes
    • Ingredients
    • Settings

How to use it

  1. Step 1: Set it up once

    Your calendar, targets and lists on Settings, ingredients at standard cost, recipe lines and the menu, plus the opening stock count and last year's P&L.

  2. Step 2: Close the period

    Units sold from the POS, food and bar stock counts and purchases, price changes, waste, staff meals, comps, voids and money off the bill, ledger sales by channel, covers, labor and operating costs.

  3. Step 3: Read the Summary

    Pick the period and read the food cost bridge, the menu matrix and the top five opportunities.

  4. Step 4: Read the checks

    All fourteen should show OK before the report goes to the owner. A red banner appears when prime cost runs above your ceiling.

Use it with AI

The file comes with a Use with AI tab. Attach a copy of the file to the AI assistant your company allows, paste a prompt and fill in the brackets. Each prompt tells the AI to read the tab first, so it knows how the file works and what not to break.

  • Ten ready-made prompts, from fitting the file to your restaurant and loading your supplier price list and recipe cards to closing the period and writing the period note.
  • A prompt that explains the food cost gap from the bridge, and one that tests a price change on Price Scenarios.
  • AI can be wrong. Check its numbers against the file and keep all fourteen checks showing OK before you share anything.

Questions about the template

Is the menu engineering template really free?

Yes. Leave your name and work email and the download appears right away. The file is yours to keep and change.

Do I need Vena to use it?

Not to start. The menu engineering template runs in plain Excel, with no macros and no add-ins. Vena comes in when several outlets, a budget and a rolling forecast need one place, with workflow and an audit trail.

What are Stars, Plowhorses, Puzzles and Dogs?

They are the four menu engineering classes. Stars sell well and earn a high margin, Plowhorses sell well at a low margin, Puzzles earn a high margin but sell little, and Dogs do neither. A dish counts as popular if it sells at least 70% of an equal share of its section.

Does it work on a 4-4-5 calendar?

Yes. The template runs on a 4-4-5 fiscal calendar of 12 periods, each ending on the Sunday stock count. Change the weeks per period on Settings if your calendar is 4-5-4 or 5-4-4.

Can I use it with ChatGPT, Claude or Copilot?

Yes. The Use with AI tab has ten ready-made prompts and a context block for any AI assistant your company allows. Check the AI's numbers against the file before you use them.

Is the sample data real?

No. Linden Street Kitchen, a made-up 110-seat bistro, and its numbers are made up, so you can see how the report works before you type in your own.

The restaurant and figures in this template are made-up sample data. MCC is an independent Vena partner.

Last updated

From a spreadsheet to a process you can trust

When several outlets and a budget and forecast need to live in one place, MCC can set the same report up in Vena for you.

Talk to our team
  1. 1

    Use this template

    Free, in plain Excel. Change the shaded inputs and the rest updates.

  2. 2

    Have MCC set it up in Vena

    Keep the Excel layout, and add one Vena data model, approvals and an audit trail. We build it and check that it ties.

  • The top of the Board Page tab in Board Pack on a Page for the made-up Larkspur Components Inc.: all 14 checks pass, eight KPI tiles with variances to budget and prior year, and the P&L for the month, quarter, year to date and full year next to an EBITDA bridge, on sample data.
    • Reporting
    • Board

    Board Pack on a Page

    A one-page board report that rebuilds itself when you pick the month. KPI tiles, P&L, EBITDA bridge, cash and commentary, from one data tab.

    Free · ExcelDownload free

  • The top of the Budget Summary tab in Hotel Budget by Department for the made-up Larch Bay Hotel: all 12 checks pass, the budget headline and what-if line, twelve KPI tiles from occupancy to EBITDA, the USALI-style summary against last year and RevPAR by month, on sample data.
    • Planning
    • Hospitality

    Hotel Budget by Department

    A driver-based annual hotel budget. Occupancy and ADR by segment, covers by outlet, a USALI-style departmental P&L to GOP and EBITDA, and a what-if in one step.

    Free · ExcelDownload free

  • The top of the Summary tab in Hotel Renovation and Expansion Budget for the made-up Larch Bay Hotel, 80 rooms today and 120 after: all 13 checks pass, a one-line verdict and twelve tiles from total project cost and equity to return on cost, IRR, NPV, payback and DSCR, on sample data.
    • Hospitality
    • Planning

    Hotel Renovation and Expansion Budget

    Is the renovation worth it? Renovate against doing nothing, month by month for 10 years, with closure, ramp-up, the loan, equity returns and seven stress tests.

    Free · ExcelDownload free

Got a problem a template doesn't cover?

Talk to our team about it. Not ready for a call? Watch the Finance Speedrun and see how we solve a real finance problem live every week.